How It Works Under the Hood
Enter average daily demand and its standard deviation, the average lead time and its standard deviation and the service level you want. The tool uses the standard formula to give the safety stock and the reorder point.
Step-by-Step Instructions
Enter demand and its variation.
Enter lead time and its variation.
Choose the service level.
Read safety stock and reorder point.
Key Features & Performance
- Five service levels
- Reorder point
- Days of cover
- Holding cost
Methodology, Formulas & Technical Standards
Safety stock = Z × √(lead time × σd² + d² × σL²).
Worked Examples & Edge Cases
50/day, σ 12, lead time 7 days ±1
95% service
98 units safety, reorder at 448
Limitations, Scope & Accuracy Notes
- • Assumes roughly normal, independent demand and lead time.
- • Estimate deviations from real history.
Local Browser Processing & Privacy
Traditional web converters upload your documents, snippets, or media files to remote servers. Safety Stock Calculator runs inside your browser tab:
Your input text and files are processed locally without uploading payloads to a processing server.
Microdeck does not log or store the files or inputs you paste into tool workspaces (normal static hosting/CDN requests still load page assets).
Working outputs stay in your browser tab and are released when you reset the tool or close the tab.
Frequently Asked Questions
What service level should I pick?
95% is common; higher costs much more stock.
Is data uploaded?
No.
Explore Related Micro-Tools
Reorder Point and Safety Stock Calculator
When to reorder: lead-time demand plus safety stock for a service level
EOQ Calculator (Economic Order Quantity)
Find the order size that minimizes ordering plus holding cost
Stockout Lost Revenue Calculator
Sales and customers lost while an item is out of stock