작동 원리 및 구조
Reorder point = average daily demand × lead time + safety stock. With variability, safety stock = z × √(L × σd² + d² × σL²), where z comes from the service level (90%: 1.2816, 95%: 1.6449, 97.5%: 1.96, 99%: 2.3263, 99.9%: 3.0902).
단계별 사용 방법
Enter average daily demand and lead time in days.
Choose a service level, and enter the standard deviation of demand and lead time if you know them.
Or switch to manual and type the safety stock.
Read the reorder point.
주요 기능 및 장점
- Normal-distribution service levels
- Variable demand and variable lead time
- Manual safety stock mode
- Clear breakdown of each term
실제 활용 사례
- Setting min levels in a spreadsheet or ERP.
- Comparing service levels and the stock they require.
- Checking supplier lead-time risk.
입출력 예시 및 엣지 케이스
Manual safety stock
Demand 15/day, lead time 14 days, safety stock 60
Reorder point 270 units
제한 사항 및 정확도 안내
- • Assumes roughly normal demand and independent days.
- • Intermittent or seasonal demand needs a different method.
브라우저 로컬 처리 및 개인정보 보호
일반 웹 변환기는 문서나 미디어 파일을 원격 서버에 업로드합니다. 재주문점·안전재고 계산기 도구는 현재 브라우저 탭 내부에서만 실행됩니다:
입력 텍스트와 파일은 외부 서버로 전송되지 않고 기기 내에서 로컬로 계산됩니다.
도구에 붙여넣은 파일이나 데이터를 서버에 기록하거나 저장하지 않습니다.
작업 결과는 브라우저 탭 메모리에만 유지되며 탭을 닫거나 초기화하면 즉시 해제됩니다.
자주 묻는 질문 (FAQ)
What is service level?
The probability of not running out of stock during the lead time.
Where do I get the standard deviation?
Compute it from daily or weekly sales history in a spreadsheet.
Is data stored?
No.